Analysis
Besides stock and consumption, the Lube Oil module handles the whole life of an oil analysis: requesting a sample, sending it to the laboratory, recording the result, checking it on board and approving it in the office.
Where to find it
Open the Lube Oil Reports module. In the tree on the left, below Overview, you will find the entry Analysis with seven folders underneath:
Selecting an analysis shows it on the right. The buttons for all the steps below sit on the ribbon tab Analysis, which appears while you are working in this part of the tree.
The workflow at a glance
Two rules decide which buttons you can see:
- Checking happens on board. Confirm Analysis is not shown in the office.
- Approval happens in the office. Approve/Reject Analysis (Office) is not shown on board.
The exception are standalone vessels, which act as vessel and office at the same time. There both buttons are shown, and the four-eyes principle is achieved through the rights instead.
If a button is missing
Every button also depends on the status of the selected analysis. Confirm Analysis only appears while the result has been received but not yet checked; Approve/Reject Analysis (Office) only while the analysis has been checked and is still waiting. If a button is missing, check the folder the analysis sits in - and the rights listed at the bottom of this page.
Requesting an analysis
- Open Lube Oil Reports and select Analysis in the tree.
- On the ribbon tab Analysis, click Request and choose the vessel.
- The analysis appears in the folder requested.
To correct the details afterwards, select the analysis and click Edit.
Requesting from a maintenance job
If a maintenance job requires an oil sample (the job code has Sampling switched on), you do not have to open the Lube Oil module. When you execute the job, the Job Report dialog shows an additional tab Sample Request - click Create Sample Request there, and the analysis is created and appears under requested. If you try to finish the job report without creating the sample request, a warning reminds you.
An analysis requested this way is linked to the job, and the job is only released once the analysis has passed both the check on board and the office approval. If a job seems to be waiting for no reason, check whether its analysis is still awaiting approval.
Adding an older analysis report
Analysis reports that exist only as a file can be added to the system afterwards. On the ribbon tab Analysis, click Upload Legacy Analysis and assign the file to a vessel and a date.
Sending the request to the laboratory
Select the analysis in the folder requested and click Send. This sends an e-mail to the laboratory.
Two safeguards make sure the status always reflects what really happened:
-
A sample only counts as sent when the e-mail actually went out. If sending fails or you cancel it, the analysis keeps its previous status and you can simply click Send again.
-
If no e-mail account is set up on the computer, you get a message telling you so. Set up the e-mail account, or ask your administrator to, then send the request again.
Recording the result
Select the analysis in the folder sent and choose one of:
-
Receive (manually) - enter the result by hand.
-
Receive (online) - fetch the result directly from the laboratory. This requires a laboratory connection.
-
Receive (online, all sent) - under More Actions, fetches the results for all sent samples at once and reports afterwards how many were retrieved.
For customers with a laboratory connection, the online interface also supports heavy fuel oil and cylinder oil samples in addition to lube oil.
The analysis then sits in received / not checked.
Checking an analysis on board
-
Select the analysis in the folder received / not checked.
-
Click Confirm Analysis.
-
Enter the date, the person who checked the sample, and the result: Passed or Failed. For a failed result please add a remark - this is what the office reads when deciding.
-
Confirm with OK.
The analysis now carries the status waiting for approval and moves into the folder of the same name. It is not finished yet.
Approving in the office
- Select the analysis in the folder waiting for approval.
- Click Approve/Reject Analysis (Office).
- Choose Approve and confirm with OK.
The analysis moves to closed and is complete. If it belongs to a maintenance job, that job is released automatically at this moment - not earlier.
Rejecting an analysis
Choose Reject instead of Approve. A reason is mandatory; without it nothing is saved.
After a rejection:
- the analysis goes back to received / not checked,
- the previous checker and check date are cleared,
- the vessel can check the analysis again with Confirm Analysis,
- the rejection stays visible in the status history, together with the reason.
This can be repeated as often as necessary. Every round remains documented.
The status history
Every analysis has a Status History table in its detail view on the right. Each step is one line with date, user and comment:
requested - sent - received - waiting for approval - closed
The newest entry is at the top. A rejection appears as its own line including the reason and the person who rejected it. If the result was received through the laboratory interface, the entry says so.
Receipt and check details are kept as lines in this history. As a visible consequence, the Analysis Received tick box in the edit window is display-only - to record a receipt, use Receive (manually) or Receive (online).
Status colours
The status label uses the same colours everywhere in the module, so the workflow stage is recognisable at first sight:
Comments, reminders and documents
You can attach comments and reminders directly to an analysis - useful when a result needs to be followed up later, or when you want a colleague to look at it. The buttons are on the ribbon tab Analysis, in the group Comments & Reminder.
Reminders appear in the reminder overview of the module, and in the User Dashboard. For the dashboard, open it, go to Configure and switch on the entry Show Reminder (Lube Oil) - like every dashboard entry, this has to be activated once per user. Each reminder line shows two columns telling you what it belongs to:
Clicking a reminder opens the analysis on the right, including its status history.
Attaching a document is a different right
Attaching a document to an analysis is not covered by the Comments/Reminder right. It stays with Request/Edit Analysis. If a user should be able to attach analysis documents, that is the right to check.
The office dashboard tile
The tile Lube Oil Analysis received, not checked shows the office what the vessels still have to do. It deliberately has no Review button - checking is done on board.
If you do not see the tile: open the User Dashboard, click Configure, enable Lube Oil Analysis received, not checked in the Analysis category and save. Like every dashboard entry, this has to be switched on once per user.
Clicking an entry in the tile opens the analysis directly. The tile also has an Attachments column: if a laboratory report is attached, you can open it right there with one click.
Optional: approval only for failed analyses
If the second approval step is too much for everyday operation, it can be limited to results that failed.
Lube Oil Reports → ribbon tab General → Configuration → Configuration General → "Office approval only required for failed analyses"
This setting is separate from the equivalent one in Bunker Reports, so both modules can be configured independently.
Rights you need
The rights must be assigned to the relevant roles. After a change of rights, users have to log off and log on again - otherwise the new buttons will not appear.